KIEV, Oct.1 – Zakhidenergo plans by June 2008 to increase the export potential of the Burshtynska heat power plant to 650 MW, Zakhidenergo technical director Stepan Dashkevych told the press.
He said that open distribution installations should be upgraded to increase the plant's export potential. The tentative cost of works will be around UAH 35.5 million.
|