UJ.com

Top 2 

                        FRIDAY, OCTOBER 4, 2024
Make Homepage /  Add Bookmark
Front Page
Nation
Business
Search
Subscription
Advertising
About us
Copyright
Contact
 

   Username:
   Password:


Registration

 
GISMETEO.RU
UJ Week
Top 1   

    
Business    

Ukraine plans to repair and restart 1.7 GW in damaged power capacity
Journal Staff Report

KYIV, July 19 - Following the results of the large-scale repair campaign, Ukraine plans to return 1.7 GW of damaged capacities to the energy system by the beginning of the autumn-winter period, the press service of the Ministry of Energy reported on Wednesday.

"Currently, the largest repair campaign in the history of Ukraine at power facilities is underway. As part of it, we plan to repair, first of all, generation facilities. Work is also underway to restore substations and networks, thermal generation facilities in regions for which it is critical. In general, we plan to add 1.7 GW to the energy system by next winter as a result of the repair campaign," Minister of Energy Herman Haluschenko said.




Log in

Print article E-mail article


Currencies (in hryvnias)
  01.10.2024 prev
USD 41.22 41.17
RUR 0.443 0.443
EUR 46.15 45.95

Stock Market
  30.09.2024 prev
PFTS 507.0 507.0
source: PFTS

OTHER NEWS

Ukrainian Journal   
Front PageNationBusinessEditorialFeatureAdvertisingSubscriptionAdvertisingSearchAbout usCopyrightContact
Copyright 2005 Ukrainian Journal. All rights reserved
Programmed by TAC webstudio