KYIV, Dec 21 – Stalkanat, the Odesa-based steel cable producer, is currently operating at 10% of its capacity due to power supply restrictions and is mulling the purchase of a generator to stabilize operation.
"Currently, we are working at 10% of our capacity due to a shortage of electricity. We are studying the possibility of buying a generator," Stalkanat CEI Serhiy Lavrynenko told Interfax-Ukraine.
According to him, the supply of electricity has deteriorated after the recent shelling of the energy infrastructure.
|