UJ.com

Top 2 

                        THURSDAY, NOVEMBER 28, 2024
Make Homepage /  Add Bookmark
Front Page
Nation
Business
Search
Subscription
Advertising
About us
Copyright
Contact
 

   Username:
   Password:


Registration

 
GISMETEO.RU
UJ Week
Top 1   

    
Business    

Zaporizhia aluminum plant ZALK resume operation after long idle period
Journal Staff Report

KYIV, Oct 26 – Zaporizhia aluminum mill ZAlK after a long idle period has started smelting aluminum from secondary metals, an industry source said Monday.

"Today, 300 kg of aluminum have been smelted from secondary raw materials – aluminum scrap," the Interfax-Ukraine's source said.

According to the source, this happened after a long downtime in production activities: "Before that, we had not smelted aluminum for a long time," the source said.




Log in

Print article E-mail article


Currencies (in hryvnias)
  27.11.2024 prev
USD 41.50 41.44
RUR 0.394 0.399
EUR 42.68 42.47

Stock Market
  26.11.2024 prev
PFTS 507.0 507.0
source: PFTS

OTHER NEWS

Ukrainian Journal   
Front PageNationBusinessEditorialFeatureAdvertisingSubscriptionAdvertisingSearchAbout usCopyrightContact
Copyright 2005 Ukrainian Journal. All rights reserved
Programmed by TAC webstudio