KYIV, Dec 21 – Donbasenergo has signed a contract with Dongfang Electric International Corporation (China) for reconstruction of unit No. 6 of the Sloviansk thermal power plant (TPP) with its division into units 6A and 6B of 330 MW each.
According to the company's press release, the cost of the contract for the reconstruction using CFB technology (the technology of coal combustion in a circulating fluidized bed) is $684.296 million.
|