KYIV, Oct 18 – DTEK Energy Holding has signed a second contract with U.S. General Electric to supply equipment for Prymorska wind farm with a total capacity of 200 MW, the press service of the holding has reported.
The first contract to supply equipment for Prymorska wind farm (100 MW) was signed in December 2017. It will be completed at the end of 2018.
The second stage of the 100 MW capacity will be also built in Zaporizhia region. The start of construction is the fourth quarter of 2018.
|