KYIV, Aug 29 – DTEK Renewables has raised EUR 90 million for construction of the first phase of Prymorska wind farm with a capacity of 100 MW in Zaporizhia region, the press service of DTEK Energy Holding reported on Tuesday.
The press service said that the loan for the construction of the first stage of the wind farm was issued by a consortium of German banks (Bayerische Landesbank, KfW IPEX-Bank, Bremer Kreditbank and others) with risk coverage provided by German export credit agency (ECA) Euler Hermes. The loan term is 10 years after the technical commissioning of the plant.
|