KYIV, Sept 26 – The deadline for implementing measures to join the European Network of Transmission System Operators (ENTSO-E) by Ukraine is July 2022, Ukrenergo Head Vsevolod Kovalchuk said.
This will enable Ukraine to work in an isolated mode from Russia, after which ENTSO-E is obliged to discuss the European integration of its operation with the Ukrainian power grid.
|