UJ.com

Top 2 

                        MONDAY, FEBRUARY 16, 2026
Make Homepage /  Add Bookmark
Front Page
Nation
Business
Search
Subscription
Advertising
About us
Copyright
Contact
 

   Username:
   Password:


Registration

 
GISMETEO.RU
UJ Week
Top 1   

    
Nation    

Ukraine to sue Russia for bridge to Crimea
Journal Staff Report

KYIV, Aug. 2 - Ukraine is preparing a lawsuit against Russian President Vladimir Putin’s bridge to Crimea, fearing that it will close off the waters of three other Ukrainian regions, Newsweek reported on Wednesday.

The bridge is mired in controversies already, without even having opened. It will be the first land link between Russia and the Crimean Peninsula, a region Russia annexed from Ukraine in 2014 but that is still recognized as Ukrainian by U.N. General Assembly majority.

The 12-mile construction is the project of Arkady Rotenberg's company. The Russian businessman is one of Putin’s closest associates and is under Western sanctions introduced because of the Crimea annexation. The bridge will cost Russia around $5 billion, Radio Free Europe estimated.

As well as being a link to an annexation considered illegal, Ukraine’s Ministry of Infrastructure fears the bridge, stretching across the narrow Kerch Strait, will also have another effect—it will close the strait. The narrow waters of the strait link the large Black Sea with the Sea of Azov, which is shared by Russia and Ukraine.

Besides Crimea, three more Ukrainian regions sit on the Azov coastline, sea access to which will be obstructed by the bridge.

Ukraine’s Justice Ministry is in the process of drafting other legal action against Russia—namely linked to issues with the annexation and supporting violent insurgencies in eastern Donetsk and Luhansk regions. According to Deputy Infrastructure Minister Yuri Lavrenyuk, the bridge, planned to open for car traffic next year, will be the specific focus of a suit.

“At the moment, a summons is being prepared, and the financial losses from unreceived cargo for the Mariupol and Berdyansk commercial ports are being calculated,” Lavrenyuk says.

“This is a global, political and complex issue, but we will absolutely resolve it,” he adds.

By December 2018, Russia hopes the road section of the bridge will be fully operational, with a rail link opening soon after.

The bridge has faced some backlash in Russia and Ukraine, where experts have queried the safety of the construction, some pointing to the collapse of the only previous attempt to link Russia with Crimea by bridge. This has not deterred current construction, however, as the failed project took place in 1944 and was much less expensive. (nw/ez)




Log in

Print article E-mail article


Currencies (in hryvnias)
  21.03.2025 prev
USD 41.54 41.57
RUR 0.489 0.497
EUR 45.00 45.32

Stock Market
  20.03.2025 prev
PFTS 507.0 507.0
source: PFTS

OTHER NEWS

Ukrainian Journal   
Front PageNationBusinessEditorialFeatureAdvertisingSubscriptionAdvertisingSearchAbout usCopyrightContact
Copyright 2005 Ukrainian Journal. All rights reserved
Programmed by TAC webstudio