UJ.com

Top 2 

                        SUNDAY, FEBRUARY 15, 2026
Make Homepage /  Add Bookmark
Front Page
Nation
Business
Search
Subscription
Advertising
About us
Copyright
Contact
 

   Username:
   Password:


Registration

 
GISMETEO.RU
UJ Week
Top 1   

    
Business    

Ukrzaliznytsia completes drilling of new Beskydsky rail tunnel
Journal Staff Report

KIEV, Nov. 1 – Ukrzaliznytsia has finished drilling of a new two-track Beskydsky tunnel on October 28 on schedule.

The company said Monday that the tunnel was drilled in two stages: the upper section and the lower section. A total of 1,764 meters were drilled.

The workers are improving the roadbed at the approaches to the tunnel, installing the track at the approaches and in the tunnel, assembly lighting, communications and control lines. It is planned that the works will be finished by late May 2017.




Log in

Print article E-mail article


Currencies (in hryvnias)
  21.03.2025 prev
USD 41.54 41.57
RUR 0.489 0.497
EUR 45.00 45.32

Stock Market
  20.03.2025 prev
PFTS 507.0 507.0
source: PFTS

OTHER NEWS

Ukrainian Journal   
Front PageNationBusinessEditorialFeatureAdvertisingSubscriptionAdvertisingSearchAbout usCopyrightContact
Copyright 2005 Ukrainian Journal. All rights reserved
Programmed by TAC webstudio