KIEV, July 18 – Ukrgazvydobuvannia has announced tenders for 75 hydraulic fracturing treatment operations to intensify natural gas production in the ProZorro procurement system. The company seeks to carry out 100 these operations.
The expected cost of services for each tender for 25 hydraulic fracturing operations is UAH 135 million. The operations are to be carried out within 12 months.
Hydraulic fracturing will be conducted on fields of Shebelynka and Poltava gas production departments at the depth of 2,800-5,000 meters.
|