UJ.com

Top 2 

                        SATURDAY, SEPTEMBER 28, 2024
Make Homepage /  Add Bookmark
Front Page
Nation
Business
Search
Subscription
Advertising
About us
Copyright
Contact
 

   Username:
   Password:


Registration

 
GISMETEO.RU
UJ Week
Top 1   

    
Business    

Progress reported on new Chop-Lviv two-track railroad tunnel
Journal Staff Report

KIEV, Jan. 21 - The first stage of building a new two-track Beskydsky tunnel has been completed.

According to the Infrastructure Ministry, the new tunnel will replace the existing single track one, which was built in 1886. It has a speed limit of 15-40km/h and remains the only "narrow" place on the Chop-Lviv route. The new tunnel is designed for a speed of 60-70 km/h and increase the capacity of this section of the track from 47 to 100 pairs of trains per day.




Log in

Print article E-mail article


Currencies (in hryvnias)
  27.09.2024 prev
USD 41.21 41.26
RUR 0.444 0.446
EUR 45.96 46.20

Stock Market
  26.09.2024 prev
PFTS 507.0 507.0
source: PFTS

OTHER NEWS

Ukrainian Journal   
Front PageNationBusinessEditorialFeatureAdvertisingSubscriptionAdvertisingSearchAbout usCopyrightContact
Copyright 2005 Ukrainian Journal. All rights reserved
Programmed by TAC webstudio