KIEV, Oct. 27 – The Metinvest Group has suspended operation of the sheet-metal shop 3000 at the Mariupol-based Illich Iron and Steel Works, for overhaul.
In order to improve energy equipment, the plant will replace pipelines and repair electric equipment.
In the course of the overhaul, it is planned to replace extradition arrangements unstressed slab furnace No. 3, as well as lift table load reducer slabs, upgrade distribution gear and videos transport roller conveyors furnaces.
|