KIEV, June 30 - Mykolaiv-based Zorya-Mashproekt will start testing a new generation 45-60 megawatt gas-turbine engine intended for the energy sector in August.
The company said that a pilot engine has been assembled. Last week the engine was moved to the testing station in Kaborha (Mykolaiv region).
Volodymyr Spitsyn, Chief Designer of the testing station, said the engine is considered engine of the 4+ generation.
|