KIEV, Nov. 23 – Kiev-based Concorde Group Ltd. plans to start building Kazantip wind power plant (Crimea) with a generating capacity of 100 MW in March-April 2011, deputy director Andriy Konechenkov told Interfax-Ukraine.
"The preparation [for the construction] has been completed by 99%, and now crediting issues are being settled. We plan that we'll start construction in March or April [2011]," he said.
|