KIEV, Sept. 20 – During talks on September 14-15, the delegations of Ukraine and the European Bank for Reconstruction and Development agreed a draft loan agreement for the construction of a 750 kV overhead power transmission line between Zaporizhia nuclear power plant and Kakhovka substation, national energy company Ukrenergo said.
The loan agreement was amended, but no details have been disclosed.
The sides also agreed the wording of draft agreement between the EBRD and Ukrenergo. The draft documents will be transferred to the EBRD board, which is to decide on the allocation of loans.
|